Constructing a new dwelling includes single detached dwellings, duplexes and/or other multi-unit buildings.
At the time of application, a damage deposit is collected to cover any damages to town infrastructure. If you have any concerns to the current state, please notify us.
To connect to the services, please review the information about our services and connecting to them.
Review our new homebuilder's package for information on building a new home.
Permit requirements
Permit requirements for a new dwelling are:
- Site plan with location of building and distances to property lines
- Floor plans including the foundation plan, elevations and, information about piles/grade beam, piles supporting roof loads, stamped engineered drawings (if using strip footing)
- Roof truss layouts and manufactured floor joist drawings
- Copy of Alberta Government's New Home Registration Certificate
- Detailed energy efficiency information
Manufactured homes
Additional permit requirements for a manufactured home are:
- CSA number
- Alberta labour number
- Serial number
- Proof of deformation resistant building